Many of these homes were built between the 1910s and the 1930s, and some of their original wiring is still live behind the plaster. We find it, explain what needs replacing, and rewire it with grounded circuits while keeping the house livable.
Why Knob-and-Tube Gets Replaced
Knob-and-tube has no ground, its rubber and cloth insulation becomes brittle with age, and decades of renovations often splice it into newer wiring. Where it has been covered by attic insulation it cannot shed heat the way it was designed to. Many insurers will not cover a home with active knob-and-tube unless it is being replaced.
Inspection Before Pricing
We trace circuits from the panel, check the attic and basement and test a sample of outlets and fixtures, so you know exactly how much knob-and-tube is still live. Some homes have one or two circuits left; others have it on every floor.
How the Replacement Works
New cable is fished through existing walls and ceilings from the basement and attic, with small planned openings only where a run cannot be fished. Work goes room by room, power is restored to finished areas each day, and each old circuit is disconnected at the panel. The job is done under an ESA permit and inspected.
Signs you might have knob-and-tube
- Single wires on porcelain knobs or tubes in the basement or attic
- Two-prong outlets in most rooms
- An insurer or home inspector has flagged the wiring
- Lights that dim when another appliance turns on
- A house built before the 1940s with original plaster walls

Knob-and-Tube Replacement — frequently asked questions
Do you have to open all my walls?
No. Most runs are fished through existing cavities, and the few small openings needed are planned so they are easy to patch.
How long does a knob-and-tube replacement take?
A few remaining circuits can take a day or two. A full rewire of a typical St. Clair West semi or detached house usually takes one to two weeks.